Asset Engineering served as the CMGC for Caprock Academy in construction of the second phase of their school. The 62,000 square foot, two story addition includes two wings of classrooms, a gymnasium, restrooms, and locker rooms. Along with Design West Architects, Asset Engineering provided aggressive Value Engineering to achieve a final building that met the school’s strict budget and instructional needs. Construction was completed during Summer 2020.
Client | Caprock Academy, Grand Junction, Colorado |
---|---|
Year | 2020 |
Services | |
Category |