Walker Field Stadium

Remodel of the Walker Field Soccer Field to create the new Maverick Lacrosse Locker Rooms and Press Box. Project included custom locker rooms to house the Maverick Men's and Women's Lacrosse Teams as well as a new Press Box and Filming Deck. Asset Engineering provided CM/GC Services, including pre-construction services, value engineering, alternates investigation and pricing, construction services.

Project Considerations

Asset Engineering Limited approached this unique remodel project with constant collaboration with the Owner, Design Team, Athletes, and Coaches. Tasked with creating Men's and Women's Lacrosse locker rooms below the existing Walker Field Soccer Stadium presented many challenges. Limited and confined spaces required dedicated and creative design ideas to be explored throughout the Pre-Construction and Construction Phases. Asset Engineering able to generate space for 80+ athletes within a very minimal existing area. Colorado Mesa University requested high-end, luxury finishes for each locker room to attract potential student athletes from elite programs across the country. Custom lockers, solid surface countertops, distinctive light fixtures, custom laser-cut logos, and high-end durable fixtures were all completed within the University's strict budget. The Project was completed during the school year; Asset Engineering maintained student/athlete access to the facility during practices and scheduled events all while maintaining the strictest safety program.

 

Client
Colorado Mesa University, Grand Junction, CO
Year
2011
Services
Category