Garfield Hall - West

Asset Engineering is currently completing the phase 3A of Garfield Hall, Garfield Hall WEST. The new dorm will include two room suites with an attached study loft. Each floor includes kitchens, bathrooms and shower rooms, study lounges, entertainment spaces, and laundry for the residents. The completed building will measure 40,000 square feet and three stories tall with a full basement. Construction is scheduled for completion in June 2016.

Asset Engineering in Grand Junction, Colorado

Employee-Owned Firm

In 2019, Asset Engineering adopted an Employee Stock Option Plan and transferred ownership to each of our employees. The creation of this plan is an honor to the culture and community upon which it was founded.