Maverick Center Expansion Phase 4

Asset Engineering provided CM/GC services for the removal and replacement of the existing Maverick Pavilion Structure which included increasing the size of the space by 33% to include an additional basketball court. Asset Engineering provided extensive pre-construction services on this project to identify and evaluate several different options ranging from reskining of the existing structure to completely removing and replacing the entire structure in order to provide the University with the best cost, warranty/lifespan, and schedule options available. We also worked closely with the University to schedule the project around the University’s needs as well as other events such as the Special Olympics held in June.