Sports Facility

Maverick Center Expansion Phase 4

Asset Engineering provided general construction and construction management services for the removal and replacement of the existing Maverick Pavilion Structure which included increasing the size of the space by 33% to include an additional basketball

Grand Valley Climbing

Asset Engineering Limited provided CM/GC services on this 14,000 square foot multilevel climbing facility. The project team provided preconstruction services, value engineering, alternates investigation and pricing, and construction services.

Red Cliffs Shooting Range

The Red Cliff Shooting Range sits on the stunning grounds of Gateway Canyons Resort, a luxury resort in Gateway, Colorado. This outdoor structure measures at just over 1,000 square feet.

CMU Maverick Center Expansion

Extensive renovation and addition to the CMU Maverick Center, Maverick Pavilion, and Phase I Health Sciences.

Walker Field Stadium

CMU Maverick Pavilion

Remodel and relocation of the temporary Maverick Pavilion to create the new Maverick Pavilion Recreation Center.16,350 square foot tent structure and masonry building to house Colorado Mesa University Athletics and Club Team activities. Project includes Performance Sport Flooring, multiple athletic courts, extensive equipment storage, office space, lobby, and reception areas.

Mesa County Fairgrounds Equestrian Center

Project consisted of the construction of new Equestrian Center complete with 75 horse stalls, electrical, lighting, public address system, and ventilation.

Asset Engineering in Grand Junction, Colorado

Employee-Owned Firm

In 2019, Asset Engineering adopted an Employee Stock Option Plan and transferred ownership to each of our employees. The creation of this plan is an honor to the culture and community upon which it was founded.